Braud Rd. at Germany Rd. Roundabout
[Roundabout]
This project will upgrade a 4-way stop-controlled intersection at Braud Road and Germany Road to a roundabout which will improve traffic flow through the intersection.
[Roundabout]
This project will upgrade a 4-way stop-controlled intersection at Braud Road and Germany Road to a roundabout which will improve traffic flow through the intersection.
[Roundabout]
This project has replaced a 4-way stop-controlled intersection at Hwy 930 and Henry Road with a roundabout to improve traffic flow through the intersection.
[Safety Widening]
This task includes the earthwork, clearing and grubbing to prepare the right-of-way for [project MA-18-12]( {{ relref ma-18-12.md }} ) which will widen a 2 mile segment of Hwy 930 (Daigle Road) from Hwy. 42 to SR 929 (Causey Rd.)
[Roundabout]
A roundabout will be installed at the intersection of LA Hwy 430 at Buzzart Roost Road.
[New Road]
A new connector road is being planned to link LA 30 to “Buzzard Roost”, also known as N. Robert Wilson Rd.
[Roundabout]
A roundabout will be installed at the intersection of LA Hwy 44 at Parker Road.
[Roundabout]
This project proposes a roundabout on LA 73 south of the I-10 interchange at the future junction of a connector road west to Bluff Rd.
[Roundabout]
A roundabout will be installed at the intersection of Perkins Road at Bluff Road.
[Resurfacing]
Parish Road 929 will receive a pavement overlay as part of DOTD project H.014642.
[Study]
US 61 / Airline Highway through Ascension Parish is undergoing design to upgrade it to a “super street.”