Projects

Hwy 929 at Braud Road Roundabout

Project # MA-18-02

[Roundabout]

This project will construct a roundabout at the intersection of Parish Road 929 and Braud Road, replacing the 4-way stop. This will improve traffic flow through the intersection.

Continue reading

Hwy 929 at Hwy 930 Roundabout

Project # MA-18-11

[Roundabout]

This project will upgrade a 4-way stop-controlled intersection at Parish Road 929 and Hwy 930 to a roundabout to improve traffic flow through the intersection.

Continue reading

Hwy 930 Value Engineering around pipelines

Project # MA-18-06

[Safety Widening]

This study was an analysis and re-design of a small, 1,500 foot portion of the “Hwy 930 Widening and Safety Improvements Project”, developed by LA DOTD. The study allowed avoidance of $2M in pipeline relocation costs.

Continue reading

Hwy 930 Widening (LA 42 to PR 929/Causey Rd)

Project # MA-18-12

[Safety Widening]

This project will widen a 2 mile segment of Hwy 930 (Daigle Road) from Hwy. 42 to SR 929 (Causey Rd.)

Continue reading

Joe Sevario Road (Merritt Evans & Norwood Intersections)

Project # MA-17-04

[Intersection Improvements]

This project is part of the overall Roddy Road (932) corridor safety widening improvements. Joe Sevario Rd. is the extension of Roddy Road north of Germany Road up to SR 933.

Continue reading

Joe Sevario Road at LA 933 Roundabout

Project # MA-19-03

[Roundabout]

This project replaces a 4-way stop-controlled intersection at LA 933 and Joe Sevario Rd. (LA 932) with a roundabout. Located near the Galvex Middle School, this project will improve traffic flow through the intersection.

Continue reading

LA 1 at LA 3089 Signalization

Project # MA-17-14

[Signalization]

This task order is a planning effort to facilitate better traffic flow along LA 1 and LA 3089 in and around Donaldsonville. Now complete, the study results have been implemented by the LA DOTD for better traffic flow.

Continue reading

LA 73 Intersection Analysis

Project # MA-17-07

[Turn Lane]

This project is a study of traffic and intersections at several locations on LA 73 (Old Jefferson Hwy.) and LA 74. Parish staff analyzed these intersections seeking the most appropriate intersection solutions - such as turn lanes, roundabouts or signalization.

Continue reading

LA 73 Turn Lane at Brown Rd

Project # MA-18-03-A

[Turn Lane]

Turn lanes will be added to Hwy. 73 southbound at Brown Road.

Continue reading

LA 73 Turn Lane at Henry Road

Project # MA-18-04

[Turn Lane]

This project will add a turn lane on Hwy. 73 southbound at Henry Road.

Continue reading