Project # MA-19-03 | updated June 15, 2021
Design
Project name: Joe Sevario Rd. @ LA 933 RoundaboutDesign firm: SJB Group
Pct complete design: 40%
Row parcels needed: 4
Row parcels acquired: 0
Construction
Contractor name:Contract duration:
Construction status: In Design
Costs
Design cost: $452,335.00Row cost: $0.00
Enviro mitigation cost: $0
Construction cost estimate: $1,500,000.00
Construction bid:
Inspections cost:
Material testing cost:
Funding
Funding federal: $1,500,000Funding state:
Funding local: $452,335.00
Funding traffic impact fees:
This project replaces a 4-way stop-controlled intersection at LA 933 and Joe Sevario Rd. (LA 932) with a roundabout. Located near the Galvex Middle School, this project will improve traffic flow through the intersection.
This project is tied to reviews and approvals by DOTD. The image below shows the location of this project.