projects

Germany Rd. at US 61 Turn Lanes

This project will improve the intersection of Germany Road at US 61 to include left, thru and right turn lanes.

Continue reading

Germany Rd. Safety Widening

This project will widen 2 miles of Germany Road from Hwy. 44 to US 61 providing safety improvements.

Continue reading

Henry Rd. (LA 73 to Tillotson) C&G

This portion of the project comprises the earthwork - the “clearing and grubbing” of right-of-way to implement the safety widening of the 1-1/2 mile segment of Henry Road from Hwy 73 to Hwy 930.

Continue reading

Henry Rd. Widening (LA 73 to Tillotson)

A 1-1/2 mile segment of Henry Road from Hwy 73 to Hwy 930, and continuing on West Lane from Hwy 930 to Tillotson Road will be widened for safety. The bridge over Muddy Creek will be replaced with a box culvert for improved channel flow.

Continue reading

Hwy 929 at Braud Road Roundabout

This project will construct a roundabout at the intersection of Parish Road 929 and Braud Road, replacing the 4-way stop. This will improve traffic flow through the intersection.

Continue reading

Hwy 929 at Hwy 930 Roundabout

This project will upgrade a 4-way stop-controlled intersection at Parish Road 929 and Hwy 930 to a roundabout to improve traffic flow through the intersection.

Continue reading

Hwy 930 Value Engineering around pipelines

This study was an analysis and re-design of a small, 1,500 foot portion of the “Hwy 930 Widening and Safety Improvements Project”, developed by LA DOTD. The study allowed avoidance of $2M in pipeline relocation costs.

Continue reading

Hwy 930 Widening (LA 42 to PR 929/Causey Rd)

This project will widen a 2 mile segment of Hwy 930 (Daigle Road) from Hwy. 42 to SR 929 (Causey Rd.)

Continue reading

Joe Sevario Road (Merritt Evans & Norwood Intersections)

This project is part of the overall Roddy Road (932) corridor safety widening improvements. Joe Sevario Rd. is the extension of Roddy Road north of Germany Road up to SR 933.

Continue reading

Joe Sevario Road at LA 933 Roundabout

This project replaces a 4-way stop-controlled intersection at LA 933 and Joe Sevario Rd. (LA 932) with a roundabout. Located near the Galvex Middle School, this project will improve traffic flow through the intersection.

Continue reading