LA 30 to Buzzard Roost Connector

Project # MA-21-01 | updated February 7, 2021

A new connector road is being planned to link LA 30 to “Buzzard Roost”, also known as N. Robert Wilson Rd.

An air photo showing the approximate position of this future road project is depicted below.

photo

Schedule

Current Phase: Preconstruction
Design Start Date: 2020
Construction Start Date: To be Determined

Status

TaskRequired? spaceComplete
a. Land / Topo Surveyyes50%
b. Subsurface Utility Eng.yes45%
c. Geotechnical Testingyes0%
d. Preliminary Designyes0%
e. Property Surveyyes0%
f. Right-of-Way Mapsyes0%
g. Final Designyes0%
h. Utility Relocationsunkn.0%
i. Biddingyes0%
j. Constructionyes0%

Team

Contractor: To be Determined
Design Consultant: _________________

Budget

Predesign Contract Amount: Pending
Construction Cost Estimate: To be Determined