MA-17-06 – Henry Road Safety Widening (LA 73 – Tillotson Rd)

Project Overview:

Safety Widening of Henry Road from Hwy 73 to Hwy 930 and West Lane from Hwy 930 to Tillotson Road. Henry Road will be widened for safety with the bridge over Muddy Creek replaced with a box culvert for improved channel flow.  

View Project on Map

Project Status
Survey 100%
Utility Investigation 100%
Geotechnical 100%
Preliminary Design 100%
ROW Acquisition 0%
Final Design 0%
Construction 0%

 

Project Schedule

Current Phase: Pre-Construction
Start Date: 9/25/2017
End Date: 10/8/2018
Duration: 378
Project Look Ahead:

Construction Timetable

Construction Start Date: TBD
Construction End Date: TBD
Construction Duration: TBD

*Construction Schedules will not be available until after the project is designed, bid and awarded.

Project Team

Contractor:  TBD
Design Consultant: GSA, Inc.

Budget and Expenditures

Design Contract Amount: $515,440.00
Construction Cost Estimate: TBD
Construction Contract Amount: TBD

Specifications

Project Number: MA-17-06
Project Length: 1.50 Miles


 