MA-18-02 – AP 929 / Braud Road Roundabout

Project Overview:

Converting at 4-way stop-controlled intersection at Parish Road 929 and Braud Road to one with a Roundabout to improve traffic operational flow through the intersection.

View Project on Map

Project Status
Survey 55%
Utility Investigation 55%
Geotechnical 80%
Preliminary Design 20%
ROW Acquisition 0%
Final Design 0%
Construction 0%

 

Project Schedule

Current Phase: Pre-Construction : Negotiation
Design Start Date: 4/9/2018
Design End Date: 1/24/2019

Construction Timetable

Construction Start Date: TBD
Construction End Date: TBD
Construction Duration: TBD

*Construction Schedules will not be available until after the project is designed, bid and awarded.

Project Team

Contractor: TBD
Design Consultant: BKI

Budget and Expenditures

Design Contract Amount:  $485,050
Construction Cost Estimate: TBD
Construction Contract Amount: TBD

Specifications

Project Number:  MA-18-02

Task Number: Not issued

Project Length:  0.5 Miles


 
Project Photos:

 