Projects

Phase 1 – Immediate Action Projects (Funded Through Construction)

  1. Airline Hwy Signal Synchronization
  2. Ashland Road – St. Landry Connector (New Roadway)
  3. Babin Road Bridge Replacement
  4. Churchpoint/Roddy Roundabout
  5. Henry Road Safety Widening (LA 73 – Tillotson Rd/Aikens Rd)
  6. LA Hwy 73 Intersection Analysis
  7. Parker Road @ Parish Road 929 Roundabout
  8. Roddy Road Safety Widening (LA 931- LA 933 including intersection improvement at LA 931)
  9. Roddy Road Safety Widening (LA 935-LA 621 including intersection improvements at LA 621 and LA 934)
  10. Roddy Road Safety Widening (US 61-LA 935 including intersection improvements at LA 429 and LA 935)

Phase 2 – (Pre-Construction Design funding)

  1. AP 929 / Braud Road Roundabout
  2. C Braud Rd. (Bluff to Hwy 73)
  3. Duplessis and Tiggy Duplessis Safety Widening
  4. Germany Road Safety Widening
  5. LA 3089 / LA Hwy 1 Signalization
  6.  LA 73 Turn Lanes (Oakland and Brown)
  7. LA 73 Turn Lane at Henry Road
  8. Germany Road / US 61 Intersection Improvements